







Free written scope consultation - allowances, timeline, and change-order rules on paper before a single trade is scheduled
Dvele Kitchen Remodeling: The Huntington Beach Owner’s Guide
Dvele-compatible kitchen remodeling in Huntington Beach typically runs $14,000 – $45,000 installed, depending on layout, cabinet line and countertop material. Most Dvele owners land in the $22,000 – $32,000 range when they keep the existing footprint. We’re an independent remodeling company, not affiliated with Dvele, and we work from the model and serial plate on your cabinetry to match parts, panels and hardware before anything gets ordered.
Owners usually find out something’s wrong in one of three ways: a drawer front that won’t sit flush after two summers of marine air, a cabinet box that’s soft around the sink base, or a countertop seam that’s started to telegraph through the laminate. In Huntington Beach, the salt air and the swing between dry Santa Ana weeks and damp coastal mornings do more damage to cabinet substrate than most homeowners expect.
Which Dvele Models This Applies To

Dvele builds to a handful of cabinet and millwork specifications across its lines, and the part you need depends on which one your kitchen was built to. The plate inside a cabinet door or on the inside of the sink base usually lists the model and the box depth. Measure the box depth, the door overlay and the drawer glide spacing before you call anyone, because those three numbers decide whether a replacement door, glide or full box is the right fix.
The compatibility snag most Huntington Beach owners hit: Dvele’s slab and shaker fronts use different hinge boring patterns, so a door pulled from one line won’t hang on the other without re-boring. That’s a $40 door turning into a $300 mistake if you order without checking the pattern first. On the OEM-versus-aftermarket question, Dvele-specific panels and matching finishes are worth sourcing through the original spec. Glides, hinges and shelf pins are a different story. A quality aftermarket glide from a recognized hardware line often outlasts the original at half the price, and we’ll tell you which way to go once we see the box.
Styles & brands we work with
- Kitchen remodeling
- Bathroom remodeling
- Home additions & ADU
- Roofing
- Windows & doors
- Driveway & pavers
- Fence
Signs Your Dvele Kitchen Remodeling Is Failing
- Doors that won’t stay aligned. The hinge plate has loosened or the particleboard around the screw holes has swollen from moisture. Once the substrate swells, tightening the screw only buys you a few weeks.
- Soft or spongy cabinet floor under the sink. Water has reached the box bottom and the substrate is breaking down. Huntington Beach’s humid coastal air slows drying, so the damage spreads further than it would inland.
- Drawer glides that grind or stick. The glide race has worn or picked up grit. Cheaper glides fail within a few years; a quality replacement glide set is usually the whole fix.
- Countertop seams that show a hairline crack. The seam adhesive has failed or the substrate beneath has shifted. Left alone, moisture gets into the seam and the crack widens through the wet season.
- Backsplash tile lifting at the grout line. The thin-set has released from the wall, often because the substrate wasn’t moisture-sealed. This one shows up most in kitchens near the beach where interior humidity stays high year-round.
See the difference
Before
After
Before
After
Before
AfterReplacement Cost & What’s Included

For Huntington Beach, here’s what the work actually runs. Cabinet installation sits at $4,000 – $13,000, countertop installation at $2,000 – $6,500, backsplash at $800 – $2,500, and a kitchen island at $3,000 – $10,000. A full kitchen remodel runs $14,000 – $45,000, and a small kitchen remodel $9,000 – $20,000. Replacing a single failed cabinet box, glide set or door is a smaller job and we’ll price it that way rather than pushing a full remodel you don’t need.
What drives the number up or down: cabinet line, countertop material (a Cambria quartz surface costs more than a laminate but carries its own lifetime warranty), whether the layout changes, and whether the substrate behind the tile needs replacing. Every homeowner gets a written price before any work starts, so the number on day one is the number on the invoice. The 365-Day Done Right Promise backs the work in writing, and if something fails inside that window we come back and fix it at no charge.
DIY or Call Us?
Some of this you can safely check yourself. Tightening a loose hinge screw, swapping a drawer glide, re-caulking a seam, measuring your cabinet box: all fine, no risk. Where DIY goes wrong is the structural and moisture work. Pulling a swollen cabinet box or re-setting a countertop seam without addressing the substrate underneath means the same failure returns in a season, and you’ve spent the money twice.
Two more honest cautions. Don’t run new electrical for under-cabinet lighting or a disposal without a licensed electrician; kitchen circuits are not a place to learn. And don’t pull a load-bearing cabinet run out on your own. If you’re not sure whether a box is structural, stop and let us look. Call (888) 329-8145 and we’ll tell you plainly whether it’s a repair or a replacement.
FAQs

Quality cabinet boxes typically hold up 15 – 25 years, but coastal Huntington Beach homes often see substrate damage at the sink base in 8 – 12 years because of year-round humidity. The boxes themselves last longer than the glides, hinges and seals around them, which is why replacing those parts early protects the whole run. Call (888) 329-8145 for an exact quote on yours; estimates are free.
Often yes. A single glide set, hinge or door front is usually a repair, not a replacement, and that’s the cheaper path we’ll recommend when it’s the right one. If the substrate around the part has swelled or softened, repair won’t hold and replacement is the honest answer. We’ll show you which one you’re looking at before you commit to anything.
A single cabinet box or glide set is generally a half-day to a full-day job. A countertop and backsplash together usually run two to four days once materials are on site, and a full kitchen remodel takes weeks, not days. We’ll give you a real schedule with the written price so you can plan around it.
We work from your model plate and the measurements on the existing part, then match the finish, overlay and boring pattern to the original spec. We don’t carry parts on a truck or keep stock; each part is ordered to your kitchen. For countertops and cabinetry we also work with KraftMaid, Cambria and Silestone, so you’ll see the material options side by side. Call (888) 329-8145 to start with a free estimate.
If your Dvele kitchen has a part that’s failed or a box that’s gone soft, the fastest way to get a real number is a phone call. Our technicians have up to 22 years of experience, they’re background-checked and arrive in uniform, and a live person answers the phone 24/7. Reach Penhallow Remodeling Huntington Beach at (888) 329-8145 to schedule your free estimate, and we’ll give you a written price before any work starts.
Written by the team at Penhallow Remodeling Huntington Beach, serving Huntington Beach and nearby areas.












